Report | 2010

Autodesk AEC Headquarters and Integrated Project Delivery: Factor Ten Engineering Case Study

By RMI
Download

This paper describes the design and construction of Autodesk’s Headquarters building. The building was a “triple win”: design and construction costs were below target (benefiting both the design-build team and owner); designer and contractor profits exceeded targets; and the building achieved LEED-CI Platinum and all other goals. The building demonstrates several principles of factor-ten engineering.