Skip to content

Autodesk AEC Headquarters and Integrated Project Delivery: Factor Ten Engineering Case Study

Jump to Section

This paper describes the design and construction of Autodesk’s Headquarters building. The building was a “triple win”: design and construction costs were below target (benefiting both the design-build team and owner); designer and contractor profits exceeded targets; and the building achieved LEED-CI Platinum and all other goals. The building demonstrates several principles of factor-ten engineering.

About the Authors

Help build the clean energy future. Donate today.

Independent research. Real-world solutions. Supported by donors.

RMI can pursue the highest-impact climate and energy solutions because we’re supported by people who believe change is possible. Every gift helps advance the work needed to make clean energy the default choice worldwide.

For other ways to give to RMI, including checks or gifts of stock, please visit Other Ways to Give.