RMI Outlet
Plug Into New Ideas
Energy Shocks Are Back. This Time, the Response Can Be Different.
Top experts from RMI and NEIS weigh in on the implications of the global energy supply disruption from the US-Iran war.
Why Regulated Utilities Lose More on Uneconomic Power Plants
Business models, not technological constraints, determine whether utilities run money-losing power plants. We offer three solutions for regulators to fix that.
Using Regional-First Planning to Streamline Large Load Interconnection
How to align the large load interconnection process and system-wide transmission planning for maximum impact.
Understanding Large Load Interconnection
An overview of the process that transmission providers and large load customers such as data centers use when a large load customer requests to connect to the electric grid.
Large Loads and Network Upgrades
Large loads are triggering an increasing volume of network upgrades. Addressing those upgrades through a piecemeal interconnection process is inefficient and costly.